You simply hand up the
1. as-built drawing (the product you want to give to client)
2. the drawing list (so that the client know the quantity)
3. Transmittal so that we have the proof the doc. already send.
So after you have check, the designer have check that check print will be stored as a documentation. While another copy without the what they call check print will be send to the kind. Kinda confused because all the jargon with are not so mental friendly.
Not an inspiriting post but if you messed up it will make your day uninspired though.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment