Life is sometime funny, out of sudden i believe in luck and chance. You see in these two days i have take on different experience out of two years. Funny, huh?

From my new understanding, why do we need to go to site? First of all, because these case is special. Usually when they contractor after finishing their work on the structure will put some red line on the drawings. On these case all the red line drawing is like a corpse that is rotten already and can't be found. In that case, site visit will be conducted and the three project that is involved will be our road map, compass for the journey for as-built. In short, we are going to incorporate the 3 project into master drawings. Basically, we need to go out there to check whether the reality is similar to the project drawings.

So what is the different between project drawings and key drawings? Get that answer later. Basically, these are new language that i have learned: A-, B: is for fabrication yard as built. C:

So my role is to check whether the drilling rig barge going to the platform. the structure modification that is made on the platform is reflected in the drawings. Put it this way when the rig barge come in for drilling, i do not know how exactly it work, but anyway the structural modification is done on the platform. Basically, high pressure, biggest producer, big asset don't messed with it.

Lastly,

(1) The first stage: IFR - Issue for Comment

Basic Drawings A C
B

Key Drawings A Z
B

(2) 2nd and last stages: ASB